We carry out drainage works and related excavations, positioning a collection pipe at least 30cm below the floor inside the building, with forced water collection by means of a downward-sloping spout in reinforced concrete and perforated piping on the upper part.
This operation is necessary and sufficient in many cases where there is excessive moisture present in the walls that butt up to a mountainside, for example.